Marion, Indiana
This project presented a standout logistical challenge, which was that all materials had to be unloaded directly from the road. CAC Wall Panels rose to the occasion, executing every delivery with accuracy and unwavering safety procedures. Through close coordination with the site superintendent, the team ensured trucks arrived exactly when framers were ready to receive and install the wall panels. The result was a project delivered on time and on budget, from the first delivery to the final panel.
Multi Family
2026

Roadside Deliveries, Zero Compromises
With no traditional unloading area available, every material on this project was unloaded directly from the road. The CAC team met this challenge head-on and executed each delivery with precision and strict safety procedures, every single time
Coordination That Kept Crews Moving
CAC worked hand-in-hand with the superintendent to time every truck arrival with the framing crew's schedule. When the trucks showed up, the framers were ready; no waiting, no wasted time, no disruption to the build sequence.
Kept on Track from Start to Finish
Despite the access challenges unique to this site, the project was completed on schedule and on budget. The materials arrived ready to install, keeping the framing crew productive and the project moving forward without delays.
Project Highlights
54,297
Square Feet
17
16
Truckloads
Truckloads